Frequently Asked Questions

GETTING STARTED

Before the first drawing.

When to bring in an architect, what we can help you learn about a property, and what to have on hand for our first conversation.

Start a Conversation →
01
When should I involve an architect?

Before you sign. The most expensive decisions on a project (which property, which lease, how much to build) are usually made before anyone calls an architect. A walkthrough with us can reveal what a listing won't: whether a restaurant can vent its kitchen, whether the restroom count supports the occupancy you're planning, whether zoning allows what you have in mind. That's when advice costs the least and changes the most.

02
Can you help me understand what is possible with my property?

Yes, and it's often the most valuable work we do. Before any design, we look at what zoning allows, what the site or building can physically support, and where the real constraints are: setbacks, parking, flood elevation, existing structure. Some answers need a survey, an engineer, or a conversation with the permitting office. We'll tell you which ones, and why, before you spend money on them.

03
What types of projects and locations do you work on?

Hospitality, wellness, civic, cultural, and commercial work is our focus, along with workplace, retail, and selected residential projects, from tenant improvements to new buildings. The studio is in West Palm Beach and works across South Florida. Eric is licensed in Florida, New York, Washington, D.C., and Arkansas, so we take on projects in those jurisdictions as well.

04
How does an initial consultation work?

The first conversation is about your project, not our pitch: your goals, budget, timeline, and whether we're the right fit. If you need professional guidance before committing to full services, such as a feasibility review, a test-fit, or a site assessment, we offer that as a defined consultation with scope and fee agreed up front.

05
What should I prepare before contacting you?

The address, what you're hoping to build, a budget range, and when you'd like to open or move in. Existing drawings, surveys, photos, and images of places you love all help. You don't need everything figured out. Sorting that out is part of what we do.

THE STUDIO

Who does the work.

Who you'll work with, where the drawings are made, and the experience behind the studio.

06
Who will I actually work with?

Eric and Vivienne, from the first meeting through construction. Eric leads the architecture and Vivienne leads interior design. There's no hand-off to a junior team once the contract is signed. The people who listen to your goals are the people who draw, coordinate, and walk the site.

07
Is the design work done in-house?

Yes. Design, drawings, and coordination happen in our West Palm Beach studio. We don't send production work overseas. Structural, MEP, and civil engineering come from licensed consultants we select and coordinate, so you still have one point of coordination for the whole set.

08
Did Eric really live in China?

Yes. Eric spent fourteen years overseas, about two in Korea and then twelve in China, until late 2022, working as design director for design and construction companies. Design and building happened side by side, so a drawing was tested against cost and schedule within days. That habit came home with him and runs through the studio: draw what can be built, price it early, and stay close to the site.

09
Can a boutique studio handle civic or larger projects?

Yes. The size of a studio and the size of a project are different questions. For larger work we assemble licensed engineers and specialists around the project, with us leading design and coordination. We're SBE certified with the City of West Palm Beach, Palm Beach County, and the School District of Palm Beach County, and our civic work includes the Golden Beach Wellness Center.

10
Can you work with a design-build team or a contractor I already have?

Yes. Eric spent most of his years overseas inside design-build companies, so working alongside a builder from day one is familiar ground. Bringing a contractor in early sharpens pricing and constructability. Our job is to keep the design intent, and your interests, intact while that happens.

11
Do you use AI in your work?

Yes, as a tool: for research, documentation checks, and testing ideas quickly. It doesn't make design decisions, interpret code on our behalf, or replace a site visit. Everything we sign and seal is reviewed and owned by a licensed architect.

FEES AND BUDGETS

Clarity on cost.

How architectural fees are set, and how we keep the design and the construction budget aligned.

12
How much do architectural services cost?

It depends on the project's size, complexity, existing conditions, and how much of the process you want us involved in. After we talk, you receive a written proposal with the scope, deliverables, fee, and payment schedule, so the number is clear before any work begins.

13
What is included in your architectural fee?

Everything we're providing is listed in the proposal, along with what isn't. Surveys, engineering, permit fees, and specialty consultants are usually separate items. We flag them early so your project budget reflects the full picture, not just our fee.

14
Can you design within my construction budget?

Yes. The budget is a design constraint, not an afterthought. We shape scope, size, materials, and complexity around what matters most to you, and we test the design against real pricing early, because contractors and the market set the final number.

15
When will we know what construction will cost?

Earlier than most people expect. Early design supports a preliminary estimate, and developed drawings support a detailed one. Bringing a qualified contractor in at key milestones checks our assumptions before more design time is spent. Final pricing comes with the agreed scope, your selections, and the contractor's proposal.

16
What happens if construction estimates exceed my budget?

We sit down with the numbers and find what's driving them. The answer is usually some mix of simplifying details, substituting materials, adjusting scope, or phasing the work, while protecting what makes the project worth building. Before revising, we agree on the direction and any effect on fee and schedule.

DESIGN AND PROCESS

How the work unfolds.

The phases of a project, how long they take, and how you review and shape the design along the way.

17
What does the architectural process involve?

We start by understanding what you're trying to achieve and what the property allows, then develop the design, then produce drawings for permitting and construction. Which phases we provide, and how involved we are during bidding and construction, is tailored to the project and agreed before we start.

18
How long does design and permitting take?

It depends on complexity, the information available, how quickly decisions are made, consultant coordination, and municipal review. You get an anticipated schedule at the outset, and we update it as the project moves. Permit review times and contractor availability are the two things nobody fully controls, so we plan around both.

19
How will I understand what the design will look like?

Through drawings and, where the scope includes them, 3D views and renderings. The goal isn't a pretty picture. It's that you understand the space, its scale, light, and character, well enough to make confident decisions before anything is built.

20
How are design revisions handled?

Design is a conversation, and feedback is built into agreed milestones. The number of revision rounds is set at the outset. If the direction, program, or budget changes after approval, that may mean additional services. We'll tell you before proceeding, never after.

PERMITS AND CONSTRUCTION

From approval to built work.

Permitting, the drawings behind it, choosing a contractor, and our role once construction begins.

21
Do you handle zoning and building permits?

Yes, as part of our scope: zoning review, permit drawings, and help with submissions. We'll say up front which tasks are ours and which need other professionals. Approval itself rests with the reviewing authority, and some projects need additional applications. We'll tell you early if yours is one of them.

22
What is the difference between permit drawings and construction documents?

Permit drawings give reviewers what they need to approve the project. Construction documents give the builder what they need to build it well: detail, coordination, and specifications. The two overlap, but a permit doesn't mean every detail is resolved, and unresolved details are a common source of change orders.

23
Can you help me choose a contractor?

Yes. We can help you find qualified bidders and compare proposals, looking past the bottom line to scope, allowances, exclusions, experience, and schedule. The lowest number isn't always the lowest cost. Your construction contract is directly with the contractor you choose.

24
What is your role during construction?

When construction-phase services are included, we visit the site, answer the contractor's questions, review submittals, and clarify the drawings. This is the stage where design intent is most easily lost. The contractor remains responsible for means and methods, site safety, scheduling, and subcontractors, and our exact role is set out in our agreement.